leg site hole core core type section date on deck time on deck technician drift angle top depth bottom depth catcher core oriented heat flow pressure core comments test test name liner curated length depth interstitial water organic geochemistry test testb liner comments date of entry time of entry adjusted top adjusted bottom latitude longitude depth below sea floor 103 639 D 001 Wash Core 01 05281985 0700 JH 0177.60 0179.60 yes no no no 069 069 0177.60 no no S SAMPLE 05281980 0715 42.14333 -12.25500 0177.60 103 639 D 001 Wash Core CC 05281985 0700 JH 0177.60 0179.60 yes no no no 008 008 0178.29 (DB) ADDED CC LL AND CL 05281980 0715 42.14333 -12.25500 0178.29 103 639 D 002 Rotary CC 05281985 0945 SH 00 0179.60 0187.30 yes no no no 017 017 0179.60 (DB) ADDED CC LL AND CL 05281980 1012 42.14333 -12.25500 0179.60 103 639 D 003 Rotary 01 05281985 1230 JLJ 00 0187.30 0196.80 yes no no no (DB) CHANGED SECT.1 CL FROM 93 CM 093 113 0187.30 no no ACED TO 113CM. TOTAL CORE SPACED = 121 CM. 05281980 1427 42.14333 -12.25500 0187.30 103 639 D 003 Rotary CC 05281985 1230 JLJ 00 0187.30 0196.80 yes no no no (DB) CHANGED SECT.1 CL FROM 93 CM 008 008 0188.43 (DB) ADDED CC LL 05281980 1427 42.14333 -12.25500 0188.43 103 639 D 004 Rotary 01 05281985 1830 JLJ 00 0196.80 0206.50 yes no no no (DB) CHANGED SECT.1 CL FROM 34 CM 034 065 0196.80 no no ACED TO 67 CM. TOTAL SPACED LENGTH = 76 CM. 05281980 1906 42.14333 -12.25500 0196.80 103 639 D 004 Rotary CC 05281985 1830 JLJ 00 0196.80 0206.50 yes no no no (DB) CHANGED SECT.1 CL FROM 34 CM 011 011 0197.45 (DB) ADDED LL AND CL 05281980 1906 42.14333 -12.25500 0197.45 103 639 D 005 Rotary 01 05281985 2330 HG 00 0206.50 0216.00 yes no no no 129 150 0206.50 no no CT.1 150 AFTER SPACING(DB) CHDG CL FROM 129 05291980 0219 42.14333 -12.25500 0206.50 103 639 D 005 Rotary 02 05281985 2330 HG 00 0206.50 0216.00 yes no no no 150 150 0208.00 no no CT.2 REMAINS 150 CM AFTER SPACING 05291980 0219 42.14333 -12.25500 0208.00 103 639 D 005 Rotary 03 05281985 2330 HG 00 0206.50 0216.00 yes no no no 021 090 0209.50 no no CT.3 90 AFTER SPACING(DB) CHDG CL FROM 21CM 05291980 0219 42.14333 -12.25500 0209.50 103 639 D 005 Rotary CC 05281985 2330 HG 00 0206.50 0216.00 yes no no no 022 022 0210.40 (DB) ADDED CC LL 05291980 0219 42.14333 -12.25500 0210.40 103 639 D 006 Rotary 01 05291985 0340 JH 00 0216.00 0225.60 yes no no no (DB) CHANGED SECT.3 CL FROM 1 AND ADDED CC LL 150 150 0216.00 no no ACED 150 05291980 0846 42.14333 -12.25500 0216.00 103 639 D 006 Rotary 02 05291985 0340 JH 00 0216.00 0225.60 yes no no no (DB) CHANGED SECT.3 CL FROM 1 AND ADDED CC LL 150 150 0217.50 no no ACED 150 05291980 0846 42.14333 -12.25500 0217.50 103 639 D 006 Rotary 03 05291985 0340 JH 00 0216.00 0225.60 yes no no no (DB) CHANGED SECT.3 CL FROM 1 AND ADDED CC LL 001 061 0219.00 no no ACED 61 EXTRA MATERIAL DUE TO SPACING OF 1 05291980 0846 42.14333 -12.25500 0219.00 103 639 D 006 Rotary CC 05291985 0340 JH 00 0216.00 0225.60 yes no no no (DB) CHANGED SECT.3 CL FROM 1 AND ADDED CC LL 027 027 0219.61 SPACED 28 TOTAL SPACED 3.89 METERSY 05291980 0846 42.14333 -12.25500 0219.61 103 639 D 007 Rotary 01 05291985 0745 JLJ 00 0225.60 0235.20 yes no no no 150 150 0225.60 no no ACED TO 150 CM. 05291980 1305 42.14333 -12.25500 0225.60 103 639 D 007 Rotary 02 05291985 0745 JLJ 00 0225.60 0235.20 yes no no no 070 126 0227.10 no no ACED TO 126 CM. (DB) CHANGED CL FROM 70 CM 05291980 1305 42.14333 -12.25500 0227.10 103 639 D 007 Rotary CC 05291985 0745 JLJ 00 0225.60 0235.20 yes no no no 010 010 0228.36 TOTAL SPACED LENGTH IS 2.86 CM. (DB) ADDED LL 05291980 1305 42.14333 -12.25500 0228.36 103 639 D 008 Rotary 01 05291985 1100 JSW 00 0235.20 0244.90 yes no no no (DB) CHANGED SECT.2 CL FROM 15 CM AND CC CL FROM 16, ADDED CC LL 150 150 0235.20 no no 05291980 1437 42.14333 -12.25500 0235.20 103 639 D 008 Rotary 02 05291985 1100 JSW 00 0235.20 0244.90 yes no no no (DB) CHANGED SECT.2 CL FROM 15 CM AND CC CL FROM 16, ADDED CC LL 015 079 0236.70 no no ACED TO 79 CM WITH OVERFLOW FROM SECTION 1. 05291980 1437 42.14333 -12.25500 0236.70 103 639 D 008 Rotary CC 05291985 1100 JSW 00 0235.20 0244.90 yes no no no (DB) CHANGED SECT.2 CL FROM 15 CM AND CC CL FROM 16, ADDED CC LL 021 021 0237.49 TOTAL SPACED LENGTH IS 2.45 CM. 05291980 1437 42.14333 -12.25500 0237.49 103 639 D 009 Rotary 01 05291985 1515 JSW 00 0244.90 0254.50 yes no no no (DB) CHANGED CC CL FROM 14 CM AND ADDED CC LL 039 065 0244.90 no no ACED TO 65 CM;(DB) CHDG CL FROM 39 CM 05291980 1639 42.14333 -12.25500 0244.90 103 639 D 009 Rotary CC 05291985 1515 JSW 00 0244.90 0254.50 yes no no no (DB) CHANGED CC CL FROM 14 CM AND ADDED CC LL 023 023 0245.55 SPACED TO 23 CM. TOTAL SPACED LENGTH - .88 M 05291980 1639 42.14333 -12.25500 0245.55 103 639 D 010 Rotary 01 05291985 2015 JLJ 00 0254.50 0264.10 yes no no no (DB) CHANGED SECT.2 CL FROM 39 143 150 0254.50 no no ACED TO 150 CM.(DB) CHANGED CL FROM 143 CM 05291980 2106 42.14333 -12.25500 0254.50 103 639 D 010 Rotary 02 05291985 2015 JLJ 00 0254.50 0264.10 yes no no no (DB) CHANGED SECT.2 CL FROM 39 039 062 0256.00 no no ACED TO 62 CM. TOTAL SPACED CORE = 2.30 M. 05291980 2106 42.14333 -12.25500 0256.00 103 639 D 010 Rotary CC 05291985 2015 JLJ 00 0254.50 0264.10 yes no no no (DB) CHANGED SECT.2 CL FROM 39 018 018 0256.62 (DB) CHANGED CL FROM 13 CM, ADDED LL 05291980 2106 42.14333 -12.25500 0256.62 103 639 D 011 Rotary 01 05301985 0045 JH 01 0264.10 0273.80 yes no no no CC SPACED AT 36 TOTAL CORE SPACED AT 3.20 METERS 150 150 0264.10 no no ACED 150 05301980 0251 42.14333 -12.25500 0264.10 103 639 D 011 Rotary 02 05301985 0045 JH 01 0264.10 0273.80 yes no no no CC SPACED AT 36 TOTAL CORE SPACED AT 3.20 METERS 087 134 0265.60 no no ACED 134 (DB) CHANGED CL FROM 87 CM 05301980 0251 42.14333 -12.25500 0265.60 103 639 D 011 Rotary CC 05301985 0045 JH 01 0264.10 0273.80 yes no no no CC SPACED AT 36 TOTAL CORE SPACED AT 3.20 METERS 036 036 0266.94 SPACED (DB) CHANGED CC CL FROM 25CM,ADDED LL 05301980 0251 42.14333 -12.25500 0266.94 103 639 D 012 Rotary 01 05301985 0730 JH 01 0273.80 0283.40 yes no no no (DB) CHANGED CC CL FROM 17 CM 150 150 0273.80 no no ACED 150 CM 05301980 0910 42.14333 -12.25500 0273.80 103 639 D 012 Rotary 02 05301985 0730 JH 01 0273.80 0283.40 yes no no no (DB) CHANGED CC CL FROM 17 CM 150 150 0275.30 no no ACED 150 05301980 0910 42.14333 -12.25500 0275.30 103 639 D 012 Rotary 03 05301985 0730 JH 01 0273.80 0283.40 yes no no no (DB) CHANGED CC CL FROM 17 CM 034 090 0276.80 no no ACED 90 (DB) CHANGED CL FROM 34 CM 05301980 0910 42.14333 -12.25500 0276.80 103 639 D 012 Rotary CC 05301985 0730 JH 01 0273.80 0283.40 yes no no no (DB) CHANGED CC CL FROM 17 CM 026 026 0277.70 TOTAL SPACED:4.15M,(DB) ADDED CC LL 05301980 0910 42.14333 -12.25500 0277.70 103 639 D 013 Rotary 01 05301985 1415 JLJ 01 0283.40 0293.10 yes no no no (DB) CHANGED SECT.3 CL FROM 1 CM 140 150 0283.40 no no ACED TO 150 CM. (DB) CHANGED CL FROM 140 CM 05301980 1611 42.14333 -12.25500 0283.40 103 639 D 013 Rotary 02 05301985 1415 JLJ 01 0283.40 0293.10 yes no no no (DB) CHANGED SECT.3 CL FROM 1 CM 150 150 0284.90 no no ACED TO 150 CM. 05301980 1611 42.14333 -12.25500 0284.90 103 639 D 013 Rotary 03 05301985 1415 JLJ 01 0283.40 0293.10 yes no no no (DB) CHANGED SECT.3 CL FROM 1 CM 001 090 0286.40 no no ERFLOW FROM SECTION 2, LINER WAS 0 CM 05301980 1611 42.14333 -12.25500 0286.40 103 639 D 013 Rotary CC 05301985 1415 JLJ 01 0283.40 0293.10 yes no no no (DB) CHANGED SECT.3 CL FROM 1 CM 035 035 0287.30 (DB) CHANGED CL FROM 22 CM, ADDED LL 05301980 1611 42.14333 -12.25500 0287.30