leg site hole core section top interval depth (cm) bottom interval depth (cm) top of core depth (m) sample midpoint depth (m) coring device analyst location source repeat column magnetic intensity exponent alternating field demagnetization magnetic intensity J(H)/Jo declination inclination comments 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 19.5 1.000 219.4 42.4 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.719 224.1 39.5 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.515 226.1 27.6 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.409 225.7 21.6 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.275 232.4 28.6 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.073 244.7 22.6 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 300 0.159 236.7 30.8 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 400 0.025 217.5 0.7 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 200 0.176 236.7 31.2 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 300 0.146 234.1 16.0 52 418 A 6 1 27.0 24.0 158.50 158.76 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 400 0.020 222.0 33.3 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 6.93 1.000 79.0 79.9 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.0741 80.1 18.8 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.793 81.5 -15.7 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.435 83.7 -18.2 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.224 86.3 -25.0 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.290 93.3 -29.4 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 300 0.336 88.5 -12.2 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 50 0.670 80.9 -18.9 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 150 0.488 86.8 -38.1 52 418 A 7 4 14.0 12.0 168.00 172.63 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 300 0.582 90.1 -34.8 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 17.2 1.000 25.1 70.8 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.535 24.4 69.3 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.048 187.9 62.1 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.032 184.6 4.3 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.092 196.5 -8.8 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.140 198.1 -21.1 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 300 0.095 157.5 14.8 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 50 0.088 191.0 58.0 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 150 0.093 196.8 -16.1 52 418 A 7 5 57.0 54.0 168.00 174.56 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 300 0.135 197.8 -36.7 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 24.1 1.000 152.4 29.2 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.861 144.0 28.5 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.496 141.9 7.4 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.249 131.7 -0.0 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.188 133.4 -17.9 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.153 138.4 -1.1 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 300 0.026 264.7 -6.9 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 100 0.233 129.6 -9.4 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 200 0.096 113.3 -19.7 52 418 A 8 1 139.0 136.0 196.50 197.88 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 300 0.014 245.6 -7.5 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 3.41 1.000 169.2 25.4 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 1.252 175.5 15.7 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.758 172.4 3.3 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.438 173.4 -3.6 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.594 173.0 -11.4 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.366 174.5 -3.8 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 100 0.323 171.6 -6.8 52 418 A 12 1 89.0 87.0 291.50 292.38 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 200 0.044 159.6 21.2 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 100.8 1.000 235.6 39.4 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.910 224.1 32.6 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 0.709 220.7 26.9 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 100 0.429 219.9 24.0 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 150 0.269 221.0 23.0 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 200 0.145 221.9 20.7 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 300 0.073 223.7 18.4 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 400 0.022 225.7 8.3 52 418 A 13 1 75.0 72.0 301.00 301.74 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 400 0.011 231.0 18.3 52 418 A 13 2 103.0 101.0 301.00 303.52 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 0.380 1.000 93.3 -4.3 52 418 A 13 2 103.0 101.0 301.00 303.52 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.679 93.7 -7.0 52 418 A 13 2 103.0 101.0 301.00 303.52 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 25 0.709 81.3 -23.6 52 418 A 15 1 12.0 10.0 320.00 320.11 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 0.816 1.000 37.6 19.3 52 418 A 15 1 12.0 10.0 320.00 320.11 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.622 57.3 43.0 52 418 A 15 1 12.0 10.0 320.00 320.11 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 1.024 39.5 32.7 52 418 A 15 1 12.0 10.0 320.00 320.11 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 25 0.630 37.6 31.5 52 418 A 15 1 12.0 10.0 320.00 320.11 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 50 0.963 30.9 66.0 52 418 A 15 1 17.0 15.0 320.00 320.16 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 NRM 0.996 1.000 58.1 31.4 52 418 A 15 1 17.0 15.0 320.00 320.16 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 25 0.929 38.8 26.0 52 418 A 15 1 17.0 15.0 320.00 320.16 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 0 6 50 2.028 51.4 22.1 52 418 A 15 1 17.0 15.0 320.00 320.16 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 25 0.958 57.4 37.9 52 418 A 15 1 17.0 15.0 320.00 320.16 CONVENTIONAL ROTARY DRILLING CORER Levi, S. ONSHORE INITIAL REPORTS OF THE DEEP SEA DRILLING PROJECT 1 6 50 2.337 51.4 26.6