leg site hole core section top interval depth(cm) bottom interval depth(cm) top of core(m) sample_depth(m) percent sand percent silt percent clay 74 525 A 9 1 95.0 95.0 184.10 185.05 11.8 41.8 46.4 74 525 A 10 51 133.0 133.0 193.60 200.93 11.0 49.7 39.3 74 525 A 11 51 120.0 120.0 203.10 210.30 8.7 43.9 47.4 74 525 A 12 5 97.0 97.0 212.60 219.57 7.5 45.9 46.6 74 525 A 13 51 130.0 130.0 222.10 229.40 4.7 47.3 48.1 74 525 A 14 51 120.0 120.0 231.60 238.80 6.0 55.8 38.2 74 525 A 15 51 120.0 120.0 241.10 248.30 7.3 48.1 44.5 74 525 A 16 51 120.0 120.0 250.60 257.80 7.4 48.4 44.2 74 525 A 17 11 120.0 120.0 260.10 261.30 3.8 48.4 47.8 74 525 A 19 5 80.0 80.0 269.60 276.40 5.3 47.1 47.6 74 525 A 20 31 126.0 126.0 279.10 283.36 2.6 53.6 43.8 74 525 A 21 5 50.0 50.0 288.60 295.10 5.9 48.6 45.5 74 525 A 22 4 88.0 88.0 298.10 303.48 2.3 60.1 37.6 74 525 A 23 5 60.0 60.0 307.60 314.20 0.9 67.9 31.2 74 525 A 24 7 47.0 47.0 317.10 326.57 3.8 67.5 28.7 74 525 A 25 6 25.0 25.0 326.60 334.35 1.6 61.2 37.2 74 525 A 26 2 85.0 85.0 336.10 338.45 1.5 65.8 32.7 74 525 A 28 1 47.0 47.0 351.60 352.07 3.3 48.9 47.8 74 525 A 29 4 41.0 41.0 355.10 360.01 2.3 37.0 60.7 74 525 A 30 41 117.0 117.0 364.60 370.27 2.3 52.5 45.2 74 525 A 31 5 18.0 18.0 374.10 380.28 3.9 36.0 60.1 74 525 A 32 7 42.0 42.0 383.60 393.02 1.7 42.9 55.4 74 525 A 35 11 118.0 118.0 402.60 403.78 2.5 27.0 70.5 74 525 A 38 2 43.0 43.0 431.10 433.03 5.6 45.3 49.1