Line 9: Line 9:
*SXI
*SXI
-
==DSCOVR==
+
==DSCOVR Issues/Updates==
-
==POES/MetOp==
+
==POES/MetOp Issues/Updates==
*SWPC discontinued processing 1/2013-will likely not resume
*SWPC discontinued processing 1/2013-will likely not resume
*NGDC processing should begin 03/2013 but will not include hemi power or belt indices
*NGDC processing should begin 03/2013 but will not include hemi power or belt indices
 +
*NOAA 17 will be discontinued 03/2013 due to solar power control issues
[[Main_Page|Back to NGDC wiki]]
[[Main_Page|Back to NGDC wiki]]

Revision as of 15:17, 5 February 2013

GOES NOP Issues/Updates

  • SEM particles
    • Coefficient update needed for the proton correction to 2MeV electrons
    • Time stamp prior to 2008 is off
      • SWPC will check what changes occurred on that day to understand the nature of the problem
      • Good time tags may exist in the SWPC database
  • MAG
  • XRS
  • SXI

DSCOVR Issues/Updates

POES/MetOp Issues/Updates

  • SWPC discontinued processing 1/2013-will likely not resume
  • NGDC processing should begin 03/2013 but will not include hemi power or belt indices
  • NOAA 17 will be discontinued 03/2013 due to solar power control issues