Data/Instrument/Algorithm status meeting

From NGDCWiki

(Difference between revisions)
Jump to: navigation, search
Line 11: Line 11:
==DSCOVR Issues/Updates==
==DSCOVR Issues/Updates==
==POES/MetOp Issues/Updates==
==POES/MetOp Issues/Updates==
-
*SWPC discontinued processing 1/2013-will likely not resume
+
*1/2013 SWPC discontinued processing 1/2013-will likely not resume
-
*NGDC processing should begin 03/2013 but will not include hemi power or belt indices
+
**NGDC processing should begin 03/2013 but will not include hemi power or belt indices
-
*NOAA 17 will be discontinued 03/2013 due to solar power control issues
+
*3/2013 NOAA 17 will be discontinued due to solar power control issues
[[Main_Page|Back to NGDC wiki]]
[[Main_Page|Back to NGDC wiki]]

Revision as of 15:19, 5 February 2013

GOES NOP Issues/Updates

  • SEM particles
    • 2010-Coefficient update needed for the proton correction to 2MeV electrons
    • 2/2103 Time stamp prior to 2008 is off
      • SWPC will check what changes occurred on that day to understand the nature of the problem
      • Good time tags may exist in the SWPC database
  • MAG
  • XRS
  • SXI

DSCOVR Issues/Updates

POES/MetOp Issues/Updates

  • 1/2013 SWPC discontinued processing 1/2013-will likely not resume
    • NGDC processing should begin 03/2013 but will not include hemi power or belt indices
  • 3/2013 NOAA 17 will be discontinued due to solar power control issues

Back to NGDC wiki

Personal tools