Data/Instrument/Algorithm status meeting

From NGDCWiki

(Difference between revisions)
Jump to: navigation, search
Line 28: Line 28:
**NGDC processing should begin 03/2013 but will not include hemi power or belt indices
**NGDC processing should begin 03/2013 but will not include hemi power or belt indices
*3/2013 NOAA 17 will be discontinued due to solar power control issues
*3/2013 NOAA 17 will be discontinued due to solar power control issues
-
[[Main_Page|Back to NGDC wiki]]
+
 
==GOES R==
==GOES R==
Line 35: Line 35:
**PDA won't be available from the remote back up unit (RBU. If there is no GRB then no data will be available during these time
**PDA won't be available from the remote back up unit (RBU. If there is no GRB then no data will be available during these time
*Class will not archive L0 data
*Class will not archive L0 data
 +
 +
[[Main_Page|Back to NGDC wiki]]

Revision as of 10:42, 13 February 2013

Contents

GOES NOP Issues/Updates

  • Lband frequency sale may make it impossible to get NOP data from the satellite
    • Sale expected 2014 but noise not expected to be significant for 10 years
    • Brent believes SWPC can get the data directly from NSOF
  • Tom DeFoor leaving June 2013
  • SEM particles
    • 2010-Coefficient update needed for the proton correction to 2MeV electrons
    • 3/2011 Error bars needed on EPEAD electrons to show when the data is bad due to proton contamination
      • Algorithm has been developed and implemented but new release has not been issued
    • 2/2103 Time stamp prior to 2008 is off
      • SWPC will check what changes occurred on that day to understand the nature of the problem
      • Good time tags may exist in the SWPC database
  • MAG
  • XRS
  • SXI

DSCOVR Issues/Updates

  • 2/2013 Developer hired
  • Sunjammer will be on same launch vehicle
  • Orbit is different from ACE
    • German satation will not see parts of orbit and may cause 8 hour gaps
    • can possibly be mitigated by phasing of the orbit
    • Other ground stations are being considered

POES/MetOp Issues/Updates

  • 1/2013 SWPC discontinued processing 1/2013-will likely not resume
    • NGDC processing should begin 03/2013 but will not include hemi power or belt indices
  • 3/2013 NOAA 17 will be discontinued due to solar power control issues


GOES R

  • Lband sell off
    • may make GRB unusable
    • PDA won't be available from the remote back up unit (RBU. If there is no GRB then no data will be available during these time
  • Class will not archive L0 data